Castlebay, UK
Client: Gael Force Engineering Ltd.
Date: 2016
Project: Castlebay Breakwater, Isle of Barra
Scope: Seven pontoons were produced at Dunstaffnage Marina, near Oban, Scotland and launched with the marina boat hoist. The pontoons were connected in their final assembly and towed to the Isle of Barra, some 140 kilometres away.
Each pontoon measures 15.00 x 4.00 x 1.80 meters with a freeboard of 50 cm, weight 37.5T.
0 meter, on anchors by others
< previous project
next project >