Castlebay, UK

 

Client: Gael Force Engineering Ltd.

 

Date: 2016

 

Project: Castlebay Breakwater, Isle of Barra

 

Scope: Seven pontoons were produced at Dunstaffnage Marina, near Oban, Scotland and launched with the marina boat hoist. The pontoons were connected in their final assembly and towed to the Isle of Barra, some 140 kilometres away.

 

Each pontoon measures 15.00 x 4.00 x 1.80 meters with a freeboard of 50 cm, weight 37.5T.

0 meter, on anchors by others

< previous project

next project >

Calle Sierra Nevada 42

Complejo El Minarete,

fase 2, 9A

O4740 Roquetas de Mar

Spain

 

Movil; +34 699 511 651

chris@orsta.nl